Triaged Tester

March 16, 2009

Test Activities during phases

Filed under: Black Box Testing,Checklist,General,Guidelines,Test Plan,Tips — Triaged Tester @ 8:51 am
Tags: ,

Test activities vary with the model and also on the type of project. So here is a generic list of items that needs to be done. You can always do it at any point when enough data is available.

1. Requirement Phase :

  • Invest in analysis at the begining of the project
  • Start developing the test set at the requirement analysis phase
  • The correctness, consistency and completeness of the requirements should be analysed.

2. Design Phase :

  • Analysis of design to check its completeness and consistency
  • Analysis of design to check whether it satisfies the requirements
  • Generation of test data based on design
  • Setting up of test bed

3. Programming/Coding Phase :

  • Check code for consistency with design
  • Perform system testing in an organized manner – Buddy testing, feature testing, integration testing, System testing etc
  • Use available tools
  • Apply stress to the program
  • Test one at a time
  • Measure test coovergae

4. Maintanence Phase :

  • Retest/Regress
Advertisements

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Create a free website or blog at WordPress.com.

%d bloggers like this: